• Post Reply Bookmark Topic Watch Topic
  • New Topic
programming forums Java Mobile Certification Databases Caching Books Engineering Micro Controllers OS Languages Paradigms IDEs Build Tools Frameworks Application Servers Open Source This Site Careers Other Pie Elite all forums
this forum made possible by our volunteer staff, including ...
Marshals:
  • Campbell Ritchie
  • Jeanne Boyarsky
  • Ron McLeod
  • Paul Clapham
  • Liutauras Vilda
Sheriffs:
  • paul wheaton
  • Rob Spoor
  • Devaka Cooray
Saloon Keepers:
  • Stephan van Hulst
  • Tim Holloway
  • Carey Brown
  • Frits Walraven
  • Tim Moores
Bartenders:
  • Mikalai Zaikin

Big OOoooooo

 
Ranch Hand
Posts: 867
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
I have a question that I have used about a week to think but still can not get an answer , so hope ranchers could answer.
I require to write a program then estimate the time using Big Ooooo notation.

Thanks for your time
[ September 24, 2004: Message edited by: siu chung man ]
 
author and iconoclast
Posts: 24207
46
Mac OS X Eclipse IDE Chrome
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Don't know anything about "Big OOOooooo" notation, but writing something like O(N) is often called "Big O" notation, so I'll assume that's what we're talking about.

When you do an estimate like that, you just take the worst case. The worst case is that you compute a random number every time through the inner loop, so you compute N^2/2 or O(N^2) random numbers. Am I missing something?
 
author
Posts: 14112
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator

Originally posted by Ernest Friedman-Hill:
Am I missing something?



Yes, the



which means that in the worst case scenario, it will run endlessly: O(infinity)
 
Francis Siu
Ranch Hand
Posts: 867
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Ernest Friedman-Hill and Ilja Preuss
thanks you very much
it will run endlessly: O(infinity)
I agree that in the worst case scenario, it will run endlessly.
It is probability question that when n-->infinity, the probability for generating the last unique random number n that assigns to an array a[infinity] is 1/infinity. I do not know how to write it in Big O notation

In the first (for loop) it is used in N times
In the second (for loop) it is used about N times
Within the second for loop, (if condition) will be infinity
So I do not know what is the Big O notation which will be O( )
Ummm......Can I write it in O(infinity)?
 
Ranch Hand
Posts: 1923
Scala Postgres Database Linux
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Without being an expert, I remember to read something (Hey, Mr. Sedgewick, nice book!), where the O(n) notation was used to estimate average or typical cases too, which is very reasonable.

If you're not good in theoritical analysis, you could try empirical analysis.

Make

(perhaps we can agree to avoid #define at least on a java-page?)

Then use a counter, to count the inner loop.
Increase MAX to 1.000, 10,000, 100,000, 1,000,000 and protocoll the values.
Put them into a diagram, to see whether it looks logarithmic, linear or exponential.

I'm not sure whether I understood the purpose of your codesnipplet,
You generate a rand-value, and if it's not in the generated values so far, you generate a new one?

So you have to ensure N is smaller than or equal to (MAX-MIN)!
But is N perhaps allways equal (MAX-MIN)?

For an arraysize of 100 and (MAX-MIN)=100, the first value in the array is found for sure in one guess (100%) and the last by 1%.
So your inner loop is run by an average of 100 times, to find a new value.
Element i is found by an average of i runs.
1 + 2 + 3 + ... 100 =
(1 + 100) + (2 + 99) + (3 + 98) + ... =
101 + 101 + 101 + ... = about 50 * 101 = 5050.

For thousend elements it would be
1 + ...... + 1000
1001 + 1001 + ... = 500,000 (not exactly).
It's increasing faster than linear.

It's about N*N/2.


But how about Arraysize being smaller than the random-range?
Assume 100,000 random-candidates and an Array of 100.
The first is gratis again.
now we have a hit expection of
1 100
2 100
3 100
...
100 99

It would only need an average of something between 100 or 101 runs to fill the array.
For 200 values perhaps 203 runs.

If the arraysize is small, compared to (MAX-MIN), the algorithm is quite good.
If the arraysize is nearly or exactly (MAX-MIN), it's poor.
 
Francis Siu
Ranch Hand
Posts: 867
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Many thanks
Stefan Wagner

You generate a rand-value, and if it's not in the generated values so far, you generate a new one?
Yes
But is N perhaps allways equal (MAX-MIN)?
yes
You have answered the question
I require to compute expected values from the program and then estimate the worse case.
[ September 25, 2004: Message edited by: siu chung man ]