File APIs for Java Developers
Manipulate DOC, XLS, PPT, PDF and many others from your application.
http://aspose.com/file-tools
The moose likes Developer Certification (SCJD/OCMJD) and the fly likes About the History information in the I7 database Big Moose Saloon
  Search | Java FAQ | Recent Topics | Flagged Topics | Hot Topics | Zero Replies
Register / Login
JavaRanch » Java Forums » Certification » Developer Certification (SCJD/OCMJD)
Bookmark "About the History information in the I7 database" Watch "About the History information in the I7 database" New topic
Author

About the History information in the I7 database

Ailsa Cape
Ranch Hand

Joined: Aug 10, 2005
Posts: 92
Hello, everyone

About 3 weeks ago, I uploaded my assignment and I haven't received the score of my SCJD exam yet.

I just search the History section in the I7 database and only find two records about my SCJD exam. One is "Exam(310-027)Sun Certified Developer for the Java 2 platform(310-027)-Pending". The other is "Enrolled in Sun Certified Developer for the Java 2 platform".
Actually, when I uploaded my assignment to the CertManager, I received a message, "Your upload has been successfully received". But in the I7 database, the information about my downloading and uploading the assignment doesn't show. I wonder whether it is correct.

After I asked for the right for uploading, I received an e-mail which granted me the right and stated that I can view my results about 2-4 weeks. But after I finished the essay exam(310-027),I got an Examination Score Report which states that I may view my results about 4-6 weeks. I want to know which instructions for the duration are right.

Thanks in advance!
Regards, Ailsa Cape
Shu Gao
Greenhorn

Joined: Aug 01, 2005
Posts: 18
Don't worry Ailsa, you'll get your score soon.

I got the same report at the test site saying it'll take 4-6 weeks.

But on the certmanager site, it says 2-4 weeks.

I guess I'll take the average, below 5 weeks..
[ November 03, 2005: Message edited by: Shu Gao ]

SCJP 1.4<br />SCJD<br />SCWCD 1.4
Ailsa Cape
Ranch Hand

Joined: Aug 10, 2005
Posts: 92
Hi, Shu Gao

Thank you for your reply. I think I should be patient to wait for my score.

Regards, Ailsa Cape
Samuel Pessorrusso
Ranch Hand

Joined: Jul 21, 2005
Posts: 164
I made the essay exam 4 weeks ago and I haven't received the results yet.
I hate to wait! It is so unconvertible!

Regards

Samuel Pessorrusso
Guillaume Compagnon
Ranch Hand

Joined: Aug 09, 2001
Posts: 106
I ve taken the exam and uploaded the assignment , the 7th september 2005.
So that makes 8 weeks ... that my history line is at "pending" status.

I have written an incident for that , one week ago , but I have got no answers... I am a bit angry

is there any penality if the results are not given in time ? (a free voucher for example ?)


---------<BR>Guillaume
Guillaume Compagnon
Ranch Hand

Joined: Aug 09, 2001
Posts: 106


I have got my results!!

Date taken 2005-09-07
Results received 2005-11-06
=> near from 9 weeks of delay !!

Grade: P
Score: 375

Comment: This report shows the total 1.4 SCJD points that could have been awarded in each section, and the actual number of points you were awarded. This is provided to give you per-section feedback on your strengths. The maximum possible score is 400; the minimum to pass is 320. General Considerations (maximum = 100): 84
Documentation (maximum = 70): 70
O-O Design (maximum = 30): 30
GUI (maximum = 40): 31
Locking (maximum = 80): 80
Data store (maximum = 40): 40
Network server (maximum = 40): 40
 
With a little knowledge, a cast iron skillet is non-stick and lasts a lifetime.
 
subject: About the History information in the I7 database
 
Similar Threads
Exam Results delay
Experience with SCJD submission
Issues on results
Results
SCJD certifcation process