aspose file tools*
The moose likes Architect Certification (SCEA/OCMJEA) and the fly likes Part 2 Big Moose Saloon
  Search | Java FAQ | Recent Topics | Flagged Topics | Hot Topics | Zero Replies
Register / Login
JavaRanch » Java Forums » Certification » Architect Certification (SCEA/OCMJEA)
Bookmark "Part 2" Watch "Part 2" New topic
Author

Part 2

Girish Mohite
Greenhorn

Joined: Jan 29, 2009
Posts: 13
Hi Guys

I am currently working on SCEA part 2.

I am planning to use the design strategy as given in Chapter 9 of SCEA Study guide.However the diagrams given look far more basic and more generic in their application.

Can someone advise based on their experience?Should there be more detailing involved?


Regards

Girish Mohite
Teja Saab
Rancher

Joined: Mar 08, 2010
Posts: 152
Girish Mohite wrote:Hi Guys

I am currently working on SCEA part 2.

I am planning to use the design strategy as given in Chapter 9 of SCEA Study guide.However the diagrams given look far more basic and more generic in their application.

Can someone advise based on their experience?Should there be more detailing involved?


Regards

Girish Mohite



The rule of thumb provided seems to suggest that we should be able to complete the entire assignment in about 40 hours of effort. If it is taking much longer than that, it is quite possible that you are providing more detail than might be necessary for the purpose of the exam. The solution provided in chapter 9 is apparently a good indication of the level of detail required in your solution. However, my solution is somewhat more detailed than the one provided in chapter 9, but not by much.


SCEA 5, SCJD,SCWCD,SCJP,PMP,IBM-SOA Solution designer,IBM-XML
Girish Mohite
Greenhorn

Joined: Jan 29, 2009
Posts: 13
Thanks for your inputs.

But do you think that the ch 9 solution is bit more generic?May be i got that feeling as my assignment too deals with biddings.



Teja Saab
Rancher

Joined: Mar 08, 2010
Posts: 152
Girish Mohite wrote:Thanks for your inputs.

But do you think that the ch 9 solution is bit more generic?May be i got that feeling as my assignment too deals with biddings.



I am sure there are aspects of the chapter 9 solution that can apply to the part 2 submission. Specifically, I don't see a lot of change being required to the deployment diagram and some aspects of the component diagram as well.
 
I agree. Here's the link: http://aspose.com/file-tools
 
subject: Part 2