• Post Reply
  • Bookmark Topic Watch Topic
  • New Topic

Distributed testing

 
Edward Herrera
Greenhorn
Posts: 7
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Hi,
I have a test plan with 4 thread and I'm performing distributed testing with 3 pcs. When I run the test each PC execute the test plan entirely. Is there any way to assign each thread to a specific PC?

thanks in advance
 
Jeanne Boyarsky
author & internet detective
Marshal
Posts: 34656
366
Eclipse IDE Java VI Editor
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Edward,
I kicking off the desired scripts on each PC a possibility?
 
Edward Herrera
Greenhorn
Posts: 7
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
thanks, how it will work?

thanks
 
Jeanne Boyarsky
author & internet detective
Marshal
Posts: 34656
366
Eclipse IDE Java VI Editor
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Originally posted by Edward Herrera:
thanks, how it will work?

That's up to you. I was thinking of manually or a Windows scheduler job. You could use any remoting system available to you though.
 
  • Post Reply
  • Bookmark Topic Watch Topic
  • New Topic